Redondo Beach ADU Builder - Design, Permitting & Full Construction

Complete ADU services for Redondo Beach homeowners, including garage conversions, detached ADUs, second-story additions, and fully engineered two-story units.

Direct ADU designs, engineers, permits, and builds Accessory Dwelling Units throughout Redondo Beach. We manage every stage of the process - architectural plans, structural engineering, Title 24, permits, construction, and inspections - ensuring a smooth and predictable ADU experience.

We support homeowners across North Redondo, South Redondo, Golden Hills, and El Nido with complete ADU planning and construction services.

ADU Design, Permit, and Construction Services in Redondo Beach, CA

Redondo Beach is ideal for backyard ADUs, garage conversions, and two-story ADUs due to wide lots, alley access, and strong rental demand. Many homes in North and South Redondo qualify for detached ADUs, even on smaller lots. We confirm setbacks, parking rules, height limits, and property eligibility during your free ADU property review.

Redondo Beach, CA, USA

ADU Projects in Redondo Beach, CA

We build ADUs for

homeowners across Redondo

Beach, including:

North Redondo

South Redondo

Golden Hills

El Nido

Villas North

// Our Service

Popular ADU Types in Redondo Beach

// garage conversion

Garage Conversion ADU Construction

Convert your detached or attached garage into a legal living space, with plumbing, insulation, and full interior finishing.

// Detached adu

Detached Backyard ADU Construction

Ideal for income rental, family housing, or guest homes. Built in backyards of single-family and multi-family homes.

// Second story adu

Second-Story ADU Construction

Add a livable second floor over an existing garage or over a single-story structure where zoning allows, to create a second story ADU.

// Engine Diagnostics & Repair

Attached ADU Construction.

An addition that is physically attached to your existing home, often sharing one wall. Great for adding extra bedrooms, rental space, or multi-generational living areas while keeping a connected floor plan.

// TWO-STORY ADU

Two-Story ADU Construction

A standalone ADU built on its own foundation with two full levels of living space. Ideal when you want to keep more open space in your yard.

// DESIGN & PERMITTING

ADU Design & Permit Service.

We manage architectural plans, engineering, Title 24, construction reports, permit submission, and corrections with the city or county.

Redondo Beach Permits & Zoning

Permits & Zoning in

Redondo Beach.

In most parts of Redondo Beach, homeowners can build detached ADUs, attached ADUs, or convert an existing garage. Two-story ADUs are popular in North Redondo and Golden Hills due to smaller lot sizes. We evaluate your lot layout, zoning, setbacks, and parking access to confirm what is possible on your property.

Site evaluation & zoning review

Architectural & structural plans

Engineering & Title 24 energy

Permit processing with LA County

Construction scheduling

City inspections

Planning an ADU in

redondo beach?

Schedule a free ADU property review and we’ll help you understand:

What type of ADU can be built on your land

Whether your garage can be converted

Estimated construction cost and timeline

Frequently Asked Questions

Can I build a rental ADU on my property in Redondo Beach?

Yes. Most ADUs in Redondo Beach can be legally rented as long-term rentals (30+ days). ADUs are popular for income generation, family housing, or multigenerational living.

Do I need extra parking for an ADU in Redondo Beach?

In many parts of Redondo Beach, no extra parking is required, especially if your property is within ½ mile of transit, or if you are converting an existing garage.

Can I build a two-story ADU in Redondo Beach?

Yes. Two-story ADUs are common, especially in North Redondo, Golden Hills, and smaller lots where using vertical space is better than losing backyard space.

Do I need architectural plans and engineering for a Redondo Beach ADU?

Yes. Redondo Beach requires architectural drawings, structural engineering, Title 24 compliance, grading plans if needed, and full permit review. We handle all these steps for you.

How long does ADU permitting take in Redondo Beach?

California law requires cities to review ADU plans in 60 days, but real approval time in Redondo Beach is usually between 8–14 weeks depending on comments or corrections.

Does Direct ADU help with ADU design and engineering, or just construction?

We handle everything - including architectural plans, structural engineering, Title 24 compliance, interior layout, permit submittals, city corrections, and full construction. You won’t need to hire separate designers or engineers.

This page is for homeowners in Redondo Beach, CA. Our main ADU office is located in Hawthorne, and we serve all

of Los Angeles County.

Direct ADU

Direct ADU is a Los Angeles County-based design-build firm specializing in ADUs, garage conversions, and complete ADU construction. From planning and permitting to full turnkey construction, we deliver functional and beautiful living spaces for homeowners throughout Hawthorne, Inglewood, West LA, Torrance, and surrounding areas

Direct ADU - Headquarters
11853 S Inglewood Ave,
Hawthorne, CA 90250

Areas We Serve: Hawthorne, Inglewood, Torrance, Gardena, Redondo Beach, Long Beach, El Segundo, West Los Angeles, Culver City, Beverly Hills, Santa Monica, Pasadena, and nearby communities across Los Angeles County.

© Direct ADU, 2025, All Rights Reserved.