Attached ADU

Give the addition a clear boundary of its own.

An attached ADU deserves a closer look when space beside or behind the house can support a useful layout and independent arrival, and the building connection can be planned around the existing home.

Start the property walk ↓
Concept diagram · existing house and ADU space

Walk the property.

Mark what you’ve checked and write down what you still need to verify.

Layout example

A side addition beside a living room

A household wants the ADU entrance along the side yard. One option keeps the approach short but puts the door near the main living room. Another makes the route longer while giving both households more privacy. Compare window sightlines, drainage, and where construction would need to open the existing wall before settling on either option.

When to revisit the choice
If the connection compromises a critical route, window, or room, compare a detached layout with the same room list and privacy goals. Look at the complete scope for both before committing to either design.

Compare a detached ADU →

Decisions that can change the project.

Use these questions to check the proposal against what is actually on the property.

Review the house and the addition as one drawing.

Locate exits, windows, downspouts, service equipment and roof lines on the existing house. A new wall can affect an adjoining room or redirect runoff. Draw those conditions in context so a clean interior plan does not hide a difficult connection.

Bring to the review

Ask for a dimensioned plan of both entrances and a section at the roof and wall junction. Show equipment that would move and verify where water will drain.

Decide which spaces the households share.

Walk both daily routes, including the trip to bins, parking, outdoors and mail. Note where one arrival route passes another household’s living or bedroom window. Ask how sound control, service penetrations and access for maintenance will be handled.

Bring to the review

Take one photo from each proposed entry. Ask the designer to show the view and shared paths from both sides of the proposed wall.

Plan the construction boundary while the home is occupied.

A joined build can require opening walls or interrupting a service. Agree on rooms and paths that need to stay usable, how weather and dust protection will work, and where deliveries or crew access would disrupt daily life.

Bring to the review

Ask the proposal to identify existing-house work and restoration separately, along with planned service interruptions and how they will be communicated.

Know what you’re reviewing.

What to ask for in the drawings

Request a dimensioned layout of both entrances plus an elevation or section through the connection. Ask for the location and treatment of shared walls, roofs, penetrations, drainage, and equipment that would move.

See what a drawing set shows →

What to ask for in the estimate

Separate the addition from work to open, protect, reconnect, and restore parts of the main house. Ask what the estimate includes for the connection, temporary protection, utility relocation, and how planned interruptions will be communicated.

Review the budget worksheet →

Bring your findings to a site review.

Have the property city, the photos from your walk, and the open scope questions ready. Use the Property Planner if you want a checklist based on how the home will be used.