Know what you’re approving at each step.

A useful roadmap connects each decision to a drawing, a written assumption, a permit response or a construction milestone.

Sage exterior with timber-lined eaves
Direct ADU project photography

Where is your project now?

Choose the situation that sounds like yours. You’ll get one task to do next, a question for your team, and a guide to help you prepare.

Feasibility

Find the questions that could change your plan.

Gather any property records you already have. Photograph the proposed location and the route from the street, including gates and steps. Write down who will live there and what space you want to keep.

Ask your team

“What do we need to verify on site before deciding between a detached ADU, an addition, or a conversion?”

What you should have afterward

A short list of workable options and the site conditions that still need checking.

Build a property checklist →
Cottage with lawn and covered seating
Cottage with lawn and covered seatingBefore the footprint is set, decide which yard space stays usable — the lawn, the covered seat, the route to both doors — and mark it on the site sketch.

The design-to-build roadmap

  1. Feasibility

    Property notes and options

    Capture the parcel, previous records, access, utilities and the household brief.

    Homeowner decisionAgree on the constraints to investigate and the options worth drawing.

  2. Schematic design

    Dimensioned layout and early site plan

    Review privacy, approach, room circulation and daylight. Compare the footprint against the yard areas you want to preserve.

    Homeowner decisionApprove the household brief and design direction.

  3. Permitting and coordination

    Drawing set and submittal record

    Ask who prepares the drawings and supporting documents, submits them and tracks comments.

    Homeowner decisionConfirm responsibilities and any design decisions that affect cost or schedule.

  4. Preconstruction

    Written scope, logistics and milestones

    Review what is included, whose selections remain open, where materials go and how the household reaches the main home.

    Homeowner decisionVerify the change approval process and milestones tied to payments.

  5. Build and closeout

    Inspection and turnover documents

    Track decisions, inspections and approved changes. Record the remaining work at the final walk-through.

    Homeowner decisionCollect applicable approvals, equipment instructions and warranties.

White gabled unit with black windows
White gabled unit with black windowsCompare the elevations and window placement in the plan set against a finished unit — where each window faces and how the gable meets the yard.

Hold the elevation beside the floor plan before finishes are chosen.

Design, permits and construction

Know what happens at each step.

Each phase should give you something concrete to review before you move on.

Feasibility

Check the lot

Walk the property, review the existing building and trace services. Ask for: constraints and options worth pursuing.

Design

Draw the options

Compare how the layout, entry, windows and yard work together. Ask for: a dimensioned layout, site plan and open decisions.

Permits

Submit the set

Coordinate architectural and supporting drawings for the reviewing agency. Ask for: the submittal checklist and who handles corrections.

Construction

Build and close out

Plan site access, inspections and selections. Ask for: a written scope, change process and closeout records.

Find the agency for your address.

Start with the property’s jurisdiction. City of Los Angeles parcels can be checked through City Planning. For an unincorporated parcel, start with LA County Planning. An address in a separate city goes through that city’s process.

Gray cottage with a covered entrance
Direct ADU project

Before construction, confirm the porch and entry details in the drawings and written scope.

Review the phase handoffs

What to review before the next phase.

Open the stage you’re in for a closer look at the records, drawings, or field decisions worth reviewing with your team.

FeasibilityDecide which options are worth drawing.
What to review
Bring a rough yard sketch, photos from street to backyard, and any older plans or permit records you have. Mark the trees, fencing, parking, and outdoor areas you want to keep.
What can hold things up
Existing drawings and what you can see on site may tell different stories. Ask your team to flag what needs measuring, investigation, or confirmation before anyone prices it.
What to leave with
A shortlist showing where each option could sit, how it could be reached, and which assumptions still need checking.
Make a site checklist →
DesignGet the layout, yard, and exterior working together.
What to review
Review the proposed floor plan and site plan together. Trace groceries from the gate to the kitchen. Look at each large window from both homes and see what it faces.
What can hold things up
A better window inside can expose a patio outside. Ask the designer to show a second orientation or revise window height and placement before settling on finishes.
What to leave with
A dated drawing set or sketch you can identify, plus a list of the decisions your team still needs from you.
Compare real drawing sets →
PermittingMake sure comments turn into decisions.
What to review
Ask for the latest submitted set, the record number if one has been assigned, and a summary of any agency comments. Ask which comments need your input.
What can hold things up
A revision may change a layout, equipment location, or work that’s in the price. Ask the team to flag the effect on scope, price, and schedule when they present the revision.
What to leave with
A list of open items, who is handling each one, and when you’ll get another update.
Use the permit and records guide →
PreconstructionTurn the scope into a plan for the day work starts.
What to review
Walk with the builder and mark what will be protected, removed, or restored. Agree where crews enter, deliveries go, and residents can walk or park.
What can hold things up
A finish may be selected while its delivery date is still unknown. Ask which selections need ordering first and what decision date protects the current schedule.
What to leave with
A written scope, site logistics plan, selection deadlines, and a description of what completed work triggers each payment.
Compare bids and allowances →
ConstructionReview the next milestone and any change in writing.
What to review
At each update, ask what was completed, what’s next, and which decision or inspection affects that next step. When a change is proposed, ask for the original scope and the proposed change side by side.
What can hold things up
A field discovery can affect surrounding work. Ask which work can continue, what is waiting on a decision, and what the proposed change means for cost and time.
What to leave with
A short lookahead, an updated list of open decisions, and a written record of any changes you approve.
Read about construction and inspections →
CloseoutTurn the final walkthrough into a useful handover.
What to review
Bring the scope and approved changes. Walk the ADU with the builder and record each open item by room or location. Have the team show you the controls and where to find the equipment information.
What can hold things up
Small items can be easy to lose track of after move-in. Record who will handle each open item, the expected date, and how you’ll confirm completion.
What to leave with
A dated walkthrough list and a handover folder with applicable sign-offs, warranties, equipment instructions, and service contacts.
Review inspection and turnover questions →
Pale cottage along a planted walkway
Cottage and planted walkway · Direct ADU project archive

A gate can change the work.

Say the only way into the backyard is a narrow side gate. Here’s how that one detail can carry through the project.

  1. On the site walk Measure the clear opening and the tightest turn. Mark the route the resident would take every day.
  2. During design Ask the team to show how turning the ADU or changing the entry changes the walk from the gate and the outdoor space you can keep.
  3. When comparing bids Have each builder show how materials will reach the build and who will repair any paving or fencing affected by the work.