Turn a site walk into a useful project brief.

Use the checklist to organize the questions a designer or builder can help you answer. Start with what you can see, measure and document.

Rear patio with a glazed garden entry
Direct ADU project photography

See how much yard each footprint leaves.

Measure a rough area you’re willing to study. Enter its width and depth, then compare two possible footprints at the same scale. Start with the sample numbers or use your own. Move each option independently to see how much space you leave on each side.

Working area

Option A

Option B

Sample dimensions · 28 × 36 ft working area

Option A

Option B

This compares rectangles inside the area you enter. Actual placement depends on site measurements, access, setbacks, utilities, and agency review. Area outside a footprint can be split into narrow strips.

Add this to my site checklist ↓

Record what the sketch can’t show.

Add measurements or notes in the fields below. Your site checklist download includes these notes and the footprint comparison.

Street and arrival

Start where people and materials arrive.

Find the route from the street to the proposed entrance. Look for steps, turns, overhead obstructions, and places where materials could be unloaded without blocking the household.

Narrowest point

Check the opening and the turn beyond it.

Measure clear width between fixed posts or walls at the tightest spot. Note whether the gate swings into the route and whether a corner or low roof makes deliveries harder.

Possible building area

Look at the space that remains.

Mark a rough building area and walk around it. Note the outdoor space you want to keep, how windows could face the house or yard, and any trees or slopes a site review should address.

Utilities and drainage

Trace a possible route and write down the unknowns.

Photograph visible utility equipment from a safe location. Note where water collects and which paving or landscape might be disturbed. Ask the site team to confirm connections and capacity.

Download from the site checklist ↓

Mark the paving and drainage the photo can’t show.

Beige cottage with a paved yard
From the built workA paved yard shows where rain collects and which surface the crew must restore.

Property check

What should you look at first?

Tell us which space you’re considering, who will live there and how they will reach it. The checklist changes with your answers.

About your property

Your site-visit checklist

Check what the garage can contribute.

  1. Find any garage permit or previous plans. Photograph the slab, framing and areas where water collects.
  2. Walk the route from the gate to the bedroom and bathroom with the future resident. Note steps, thresholds and tight turns.
  3. Measure the tightest opening and photograph corners, steps and overhead obstacles.
  4. Locate the electrical panel and note where plumbing might connect.

Notes stay on this page until you download them. You can leave this blank.

This checklist prepares you for a site review. The reviewing agency and design team determine what can be built.

Walk the property in this order.

Street to gate

Photograph where someone arrives and where materials might be unloaded. Measure the tightest clear opening and flag corners, steps, low branches or wiring.

Gate to front door

Walk to the proposed door carrying something bulky. Mark where grading, thresholds or poor lighting could make the route difficult. Record where this route crosses the main household’s path.

The building area

Sketch the locations of existing structures and yard features you want to keep. Add the proposed footprint as a rough reference. Bring any survey or previous drawing set for the team to compare.

Utility and drainage points

Photograph the electrical panel and visible utility points. Mark areas where water collects or slopes toward the proposed building. Ask who will verify actual routes and service capacity.

Decide which yard space you want to keep before you walk the rest of the property.

Gray gabled unit with a green garden
From the built workThe garden you keep shapes the footprint you choose.

What to bring to the first review

Organize a small set of records and photos. Identify assumptions clearly so the team knows what still needs verification.

BringWhy it helpsIf it is missing
Property recordsAn address and parcel record help identify the reviewing agency. Existing approvals clarify what prior work is documented.Write down any history you know and ask the team how to look up previous permits.
Photos and measurementsA photo sequence from the street to the yard shows access. A tape measure in the photo gives the team a useful reference.Bring wide views and mark where an on-site measurement is still needed.
A household briefList the people, daily routines, privacy needs and outdoor space the ADU must support.Start with your three priorities and one feature you could trade away.
Your initial budget itemsAn initial list helps identify which items might be priced separately and where investigation is needed.Use the Budget Studio worksheet to list what you have and leave unknowns blank.
Rear patio with a glazed garden entry
Direct ADU project

Photograph any paving, steps or drainage along the approach.

Site review checklist

Get ready for the site walk.

Check off what you already have. Your downloaded checklist includes the items you still need to gather.

0 of 4 preparation items checked.

Return to download your checklist ↑

Talk through your property with Direct ADU.

Bring the downloaded checklist and any property records you can find.