Build a total you can explain and compare.

Put your own figures into the worksheet, then compare written proposals line by line. This is a planning tool for homeowner inputs.

White cottage with a glass wall and patio
From the project archiveFinishes and the outdoor scope are priced together — the glass wall, the patio surface and the planting edge all belong in the same written estimate.

Budget Studio

Compare the scope behind the price.

Build a working total with your figures, then use the questions below to check whether two proposals cover the same work.

Planning total

—

Enter your figures to see a planning total.

The total uses your inputs. A blank item contributes zero, so check for missing or excluded costs.

See where the money goes.

Enter your figures above to see how the total is divided.

Try one change.

Enter an extra cost you’re considering, such as a longer utility trench. Use an amount that’s outside your worksheet. This preview keeps your current contingency percentage and leaves your worksheet figures in place.

Example: $4,000 in added work with a 10% reserve increases the planning total by $4,400.

Questions to ask before you sign

Drawings, engineering and permits
Ask who prepares the drawings and calculations, who submits them, who handles corrections and which agency fees are included.
Access and underground work
Trace water, sewer, power and drainage. Ask about trench lengths, service upgrades, access for equipment and restoration of the yard.
Construction and finishes
Ask for materials, quantities and installation allowances. Review what happens if a selection runs over the allowance.
Unknown conditions and changes
Identify what needs investigation, who carries each risk and how scope, cost and timing changes are approved in writing.

Compare payment milestones. Ask what work completes each milestone, what documentation comes with it, and how you approve the effect of a change on cost and schedule.

An outdoor stair or new entry route is part of the written scope, not an afterthought. Ask both builders to price the steps, landing and railing in the same line item.

Gray exterior with an outdoor stair
From the project archiveStairs and access changes belong in the estimate, not the contingency.

Put two estimates on the same footing.

Mark each entry as included, excluded, allowed for, or still unknown. Ask both builders to address the same items in writing.

Review areaWhat to matchQuestion for each builder
Drawing deliverablesSpecify architecture, engineering, energy documentation and revisions.Who obtains each item and what is billed separately?
Permits and site investigationDocument fees, utility checks, any existing-condition work and agency coordination.What could still change after records are found or the property is opened up?
Construction and allowancesIdentify building systems, finish allowances and installation. Check exact units and quantities.How are allowance differences reconciled and who approves them?
Site work and restorationList demolition, trenching, service upgrades, drainage, access and final repair of affected areas.Which paths, paving, gates or planting are included at closeout?
Payment and changesMatch milestone payments to work completed and clarify the written change-order process.Who documents price, time and authorization before a change goes forward?
Two gray gabled volumes around a patio
From the project archivePaving, site restoration and the finished ground plane are where two estimates most often diverge — confirm what each bid puts back.

Understand the numbers before comparing totals.

An allowance covers a defined item

Ask how many items or how much material it covers, which labor is included and how a selection changes the price. A low allowance can make two very similar scopes look different at first.

A contingency covers uncertainty

Keep the reserve visible in your budget. When field or agency information clarifies a risk, replace the provisional assumption with a written price or documented exclusion.

An exclusion still belongs somewhere

If a proposal excludes a cost, note who is responsible and how it will be measured. Include owner-paid items in your planning total so that you can compare complete project costs.

An estimate gets more useful as scope firms up

Track assumptions by phase. Confirm site and utility conditions early, use coordinated drawings for pricing, and ask for a written scope and allowance schedule before committing.

Covered modern patio with seating
Direct ADU project

Ask who is pricing the patio, its cover and the paving it connects to.

See more built work
Dry garden and paved approach
Direct ADU project archive · Paved approach

Walk the route before you compare bids.

Start at the street and walk to the proposed ADU with each builder. Point out gates, turns, existing paving and anything you want to keep. Then ask them to trace the route for equipment and the route for utilities.

Ask each builder to mark which paving, fencing or planting they’d remove and what they’d put back. Write that scope into both proposals so the finished yard is part of the price you compare.

Make a site checklist →

Record the differences between bids.

Use the same questions for both proposals. Save the notes with your worksheet so you can take them to a scope review.