See where the money goes.
Enter your figures above to see how the total is divided.
- Drawings and engineering—
- Permits and agency fees—
- Site work and utilities—
- Building and finishes—
- Owner costs and exclusions—
- Contingency—
Budget Studio
Put your own figures into the worksheet, then compare written proposals line by line. This is a planning tool for homeowner inputs.

Budget Studio
Build a working total with your figures, then use the questions below to check whether two proposals cover the same work.
Enter your figures above to see how the total is divided.
Enter an extra cost you’re considering, such as a longer utility trench. Use an amount that’s outside your worksheet. This preview keeps your current contingency percentage and leaves your worksheet figures in place.
Example: $4,000 in added work with a 10% reserve increases the planning total by $4,400.
Compare payment milestones. Ask what work completes each milestone, what documentation comes with it, and how you approve the effect of a change on cost and schedule.
An outdoor stair or new entry route is part of the written scope, not an afterthought. Ask both builders to price the steps, landing and railing in the same line item.

Mark each entry as included, excluded, allowed for, or still unknown. Ask both builders to address the same items in writing.
| Review area | What to match | Question for each builder |
|---|---|---|
| Drawing deliverables | Specify architecture, engineering, energy documentation and revisions. | Who obtains each item and what is billed separately? |
| Permits and site investigation | Document fees, utility checks, any existing-condition work and agency coordination. | What could still change after records are found or the property is opened up? |
| Construction and allowances | Identify building systems, finish allowances and installation. Check exact units and quantities. | How are allowance differences reconciled and who approves them? |
| Site work and restoration | List demolition, trenching, service upgrades, drainage, access and final repair of affected areas. | Which paths, paving, gates or planting are included at closeout? |
| Payment and changes | Match milestone payments to work completed and clarify the written change-order process. | Who documents price, time and authorization before a change goes forward? |

Ask how many items or how much material it covers, which labor is included and how a selection changes the price. A low allowance can make two very similar scopes look different at first.
Keep the reserve visible in your budget. When field or agency information clarifies a risk, replace the provisional assumption with a written price or documented exclusion.
If a proposal excludes a cost, note who is responsible and how it will be measured. Include owner-paid items in your planning total so that you can compare complete project costs.
Track assumptions by phase. Confirm site and utility conditions early, use coordinated drawings for pricing, and ask for a written scope and allowance schedule before committing.

Ask who is pricing the patio, its cover and the paving it connects to.
See more built work
Start at the street and walk to the proposed ADU with each builder. Point out gates, turns, existing paving and anything you want to keep. Then ask them to trace the route for equipment and the route for utilities.
Ask each builder to mark which paving, fencing or planting they’d remove and what they’d put back. Write that scope into both proposals so the finished yard is part of the price you compare.
Make a site checklist →Use the same questions for both proposals. Save the notes with your worksheet so you can take them to a scope review.
Bring your worksheet and the list of unknowns. We can discuss what to verify first.