Direct ADU / ADU Types

What fits your property?

Find the best options to investigate, compare what each adds to the scope, and walk into a site review with the right questions.

Charcoal exterior with lit windows
Charcoal exterior at dusk · Direct ADU project archive

Which options should you price first?

Build a starting shortlist from what you have and what you need. Use the result to decide what to measure, draw or verify.

Start with these two approaches

Garage conversion and detached ADU

Your garage gives you a footprint to evaluate. Compare what can be reused against the same layout built new.

Check before pricingMeasure the narrowest gate and turn, then photograph the route from both ends. Ask how residents, construction crews and materials would move through it.

Compare this shortlist ↓

See what changes with each approach.

Switch between options to see how each one changes the layout or the work you’ll need to price.

White gabled unit with black windows
Direct ADU project archive

Detached ADU

A front door of its own

How much yard remains when both homes have a usable entrance?

Walk the two arrival routes and mark the outdoor areas you want to keep. Then ask where the service lines and material deliveries would go.

Side by side

Compare what each option asks of your lot.

Choose two approaches to see where they fit, what can change the scope, and what to ask your builder.

Best starting conditions
A yard that can accommodate a second building while keeping a defined entry route.
First check on your lot
Lay out the building corners and measure how people and materials would reach them.
What can change the scope
New foundations and utility runs. Check which paving, trees and landscape would be affected.
A question to ask your builder
Where would the service lines run, and what work is needed to reach the construction area?
Open the planning guide →
Best starting conditions
A garage with useful dimensions, a practical approach and a structure worth investigating.
First check on your lot
Check permit records. Inspect the slab, framing, roof and clear ceiling height with the project team.
What can change the scope
Reused structure may preserve the yard. Unexpected repairs or utility work can change the scope.
A question to ask your builder
What can you verify before pricing, and what would need to be opened up?
Open the planning guide →

Use this to prepare questions and verify site conditions with your project team.

What makes an option worth drawing?

Start with what you want to protect

Choose one outcome you would hate to lose. It might be a private yard, a downstairs bedroom, garage storage, or a clear route for family to come and go. Compare options against that outcome before counting bedrooms.

Check the existing property

Photograph the route from the street, locate the narrowest opening, and gather plans or permits you already have. These are useful for either new construction or conversion. Shared access, drainage, and existing utilities can affect which option is worth drawing.

Compare the whole scope

For each option, ask what happens beyond the floor plan. Look at excavation, connections, temporary access, protection, and restoration. When an estimate relies on a condition that has yet to be verified, ask how and when the team will check it.

See all four options at a glance.

Use this to check the scope of work. Then compare the two options you want your team to draw or price.

ADU approaches by construction scope, access, and drawings
What to compareDetached backyard ADUGarage conversionAttached ADUTwo-story ADU
What gets builtNew building, foundation and enclosure.Work inside an existing shell plus any needed repairs.New construction joined to the main house.A vertical layout with upper-floor structure and stairs.
Yard and accessSeparate entrance is easier to plan if there is a usable side route.Existing footprint can preserve yard, but check lost storage or parking.Shared edges and construction access affect both homes.A smaller footprint can preserve yard when the stair and approach work.
Scope to price earlyUtility trenches, site access, foundation and finished yard restoration.Slab moisture, framing, ceiling clearance and service connections.Roof tie-in, drainage, shared wall, service relocation and protection.Stair and landing, structure, work at height and service distribution.
Drawing that helps mostDimensioned site plan showing routes and usable outdoor areas.Existing and proposed plans showing what can be kept and what changes.An elevation or section through the connection plus both entry routes.Both floor plans and a stair section, with exterior elevations.
Reason to revisitNo workable building position, access route or utility path.Reuse depends on unverified structure or repairs that change the budget.The addition removes essential daylight, access or space from the main home.A necessary ground-floor room no longer fits, or height needs further review.

Compare each building type against the yard, access and view it asks for.

Two-story exterior with a timber accent wall
From the built workA two-story option trades ground-floor area for the outdoor space below.

Questions to settle before design.

Is a two-story ADU a separate type of permit?

Two-story describes the layout. A two-story design may be detached or attached. The project team should confirm the applicable height and site requirements with the agency before drawing around an upper floor.

Do I need a custom design if I find a standard plan?

Use a standard plan to test a room layout. Your site still needs review for placement, access, utilities and foundation conditions. Ask the local agency what site-specific drawings and checks it requires.

Does a garage conversion automatically cost less?

Cost depends on what can stay, what needs repair, and what changes to utilities and access. Ask for a written list of assumed reuse, known replacement and provisional work before comparing the estimate with a new build.

What should I have before requesting a proposal?

Bring the property city and address, any existing plans or permits, photos of the route from the street, the layout priorities and the options you want compared. Ask the team to document what remains unverified.

Wood upper level above a garage
Direct ADU project

A two-level design changes where stairs, entries and upper windows can go.

Explore two-story ADUs

Verify the rules for your address.

Start by identifying your permitting agency. Confirm placement, height, and any property-specific conditions before relying on a layout or estimate.

Open the permit guide →California ADU Handbook ↗City of Los Angeles ADU resources ↗LA County ADU resources ↗

Still have two options in mind?

Bring the property address and tell us what space you want to keep. We can review the trade-offs with you.