
Detached ADU
A front door of its own
How much yard remains when both homes have a usable entrance?
Walk the two arrival routes and mark the outdoor areas you want to keep. Then ask where the service lines and material deliveries would go.
Direct ADU / ADU Types
Find the best options to investigate, compare what each adds to the scope, and walk into a site review with the right questions.

Build a starting shortlist from what you have and what you need. Use the result to decide what to measure, draw or verify.
Start with these two approaches
Your garage gives you a footprint to evaluate. Compare what can be reused against the same layout built new.
Check before pricingMeasure the narrowest gate and turn, then photograph the route from both ends. Ask how residents, construction crews and materials would move through it.
Switch between options to see how each one changes the layout or the work you’ll need to price.

Detached ADU
How much yard remains when both homes have a usable entrance?
Walk the two arrival routes and mark the outdoor areas you want to keep. Then ask where the service lines and material deliveries would go.
Garage conversion ADU
Which parts of the shell can you realistically keep?
Compare the finished floor-to-ceiling height with what you measure today. Separate confirmed reuse from work that depends on opening the structure.
Attached ADU
Will both entries and the existing house still work?
Put both routes, nearby windows, and the roof connection on the same drawing. Check how drainage, temporary protection, and service interruptions would be handled.

Two-story ADU
What will the stairs and upper windows change?
Test what needs to work on the ground floor. Draw the stair and both landings, then check what upper windows would face before settling on the footprint.
Side by side
Choose two approaches to see where they fit, what can change the scope, and what to ask your builder.
Use this to prepare questions and verify site conditions with your project team.
Choose one outcome you would hate to lose. It might be a private yard, a downstairs bedroom, garage storage, or a clear route for family to come and go. Compare options against that outcome before counting bedrooms.
Photograph the route from the street, locate the narrowest opening, and gather plans or permits you already have. These are useful for either new construction or conversion. Shared access, drainage, and existing utilities can affect which option is worth drawing.
For each option, ask what happens beyond the floor plan. Look at excavation, connections, temporary access, protection, and restoration. When an estimate relies on a condition that has yet to be verified, ask how and when the team will check it.
Use the archive to study specific design decisions. The original photos illustrate the features described below. Explore the full gallery →

Detached
A separate cottage changes how two households cross the property. Place both doors on one sketch and see what happens to privacy, outdoor use, and service access. A freestanding location can work well when those routes are clear.
Take this to a site review. Draw one position near the house and one at the rear using the same room list. Compare the outdoor area and approach each leaves.
Open the planning guide →
Two-story
An upper level can preserve more usable ground. Stair and landing space, sightlines, and daily trips between rooms can change whether the layout works. Review the two levels together before fixing the shape.
Take this to a site review. Ask for plans of both floors and a stair section. Compare them with a single-level layout using the same household needs.
Open the planning guide →
Garage and upper-floor reference
A photo of an upper level above a garage can illustrate massing. If your project involves an existing garage, review its actual records, foundation, framing, and clear height before using the image as inspiration for a conversion or an addition.
Take this to a site review. Ask the designer to show existing conditions separately from proposed work. Ask the builder which pieces of reuse still need investigation.
Open the planning guide →
Exterior and privacy reference
Use an exterior photo to think about windows and privacy. On an attached design, the roof junction, drainage, and relation to the existing windows all deserve a drawing. The shared edge may matter more than the room count.
Take this to a site review. Bring photos of the connection from both ends and mark downspouts, service equipment, and windows that need to remain useful.
Open the planning guide →Use this to check the scope of work. Then compare the two options you want your team to draw or price.
| What to compare | Detached backyard ADU | Garage conversion | Attached ADU | Two-story ADU |
|---|---|---|---|---|
| What gets built | New building, foundation and enclosure. | Work inside an existing shell plus any needed repairs. | New construction joined to the main house. | A vertical layout with upper-floor structure and stairs. |
| Yard and access | Separate entrance is easier to plan if there is a usable side route. | Existing footprint can preserve yard, but check lost storage or parking. | Shared edges and construction access affect both homes. | A smaller footprint can preserve yard when the stair and approach work. |
| Scope to price early | Utility trenches, site access, foundation and finished yard restoration. | Slab moisture, framing, ceiling clearance and service connections. | Roof tie-in, drainage, shared wall, service relocation and protection. | Stair and landing, structure, work at height and service distribution. |
| Drawing that helps most | Dimensioned site plan showing routes and usable outdoor areas. | Existing and proposed plans showing what can be kept and what changes. | An elevation or section through the connection plus both entry routes. | Both floor plans and a stair section, with exterior elevations. |
| Reason to revisit | No workable building position, access route or utility path. | Reuse depends on unverified structure or repairs that change the budget. | The addition removes essential daylight, access or space from the main home. | A necessary ground-floor room no longer fits, or height needs further review. |
Compare each building type against the yard, access and view it asks for.

Two-story describes the layout. A two-story design may be detached or attached. The project team should confirm the applicable height and site requirements with the agency before drawing around an upper floor.
Use a standard plan to test a room layout. Your site still needs review for placement, access, utilities and foundation conditions. Ask the local agency what site-specific drawings and checks it requires.
Cost depends on what can stay, what needs repair, and what changes to utilities and access. Ask for a written list of assumed reuse, known replacement and provisional work before comparing the estimate with a new build.
Bring the property city and address, any existing plans or permits, photos of the route from the street, the layout priorities and the options you want compared. Ask the team to document what remains unverified.

A two-level design changes where stairs, entries and upper windows can go.
Explore two-story ADUsStart by identifying your permitting agency. Confirm placement, height, and any property-specific conditions before relying on a layout or estimate.
Open the permit guide →California ADU Handbook ↗City of Los Angeles ADU resources ↗LA County ADU resources ↗Bring the property address and tell us what space you want to keep. We can review the trade-offs with you.