Property Planner
Turn a site walk into a useful project brief.
Use the checklist to organize the questions a designer or builder can help you answer. Start with what you can see, measure and document.

See how much yard each footprint leaves.
Measure a rough area you’re willing to study. Enter its width and depth, then compare two possible footprints at the same scale. Start with the sample numbers or use your own. Move each option independently to see how much space you leave on each side.
Working area
Option A
Option B
Sample dimensions · 28 × 36 ft working area
Option B
This compares rectangles inside the area you enter. Actual placement depends on site measurements, access, setbacks, utilities, and agency review. Area outside a footprint can be split into narrow strips.
Add this to my site checklist ↓What to look for when you walk your property
These project references show three details that are easy to miss on a blank lot sketch. Explore the full gallery →

Decide what the yard needs to do
Before placing the unit, mark a patio or outdoor area that still works for daily use. Test two positions from the existing home’s main window and from the proposed ADU door.
Take this to a site review. Bring a marked photo showing the outdoor area and the route each household would take to reach it.

Walk the route with a tape measure
Measure the tightest clear opening, then continue past it. A turn, a step, or a low overhang can change how people enter and how crews bring materials through.
Take this to a site review. Take a wide photo of the entire approach, then a close view of each pinch point with a measurement.

Account for the work beyond the walls
Keep the building outline separate from the routes for plumbing, power, drainage, and deliveries. Ask which paving, fencing, or landscaping may be moved, and what should be restored afterward.
Take this to a site review. Mark likely service areas on the sketch and have the project team verify the connections and scope.
Record what the sketch can’t show.
Add measurements or notes in the fields below. Your site checklist download includes these notes and the footprint comparison.
Street and arrival
Start where people and materials arrive.
Find the route from the street to the proposed entrance. Look for steps, turns, overhead obstructions, and places where materials could be unloaded without blocking the household.
Narrowest point
Check the opening and the turn beyond it.
Measure clear width between fixed posts or walls at the tightest spot. Note whether the gate swings into the route and whether a corner or low roof makes deliveries harder.
Possible building area
Look at the space that remains.
Mark a rough building area and walk around it. Note the outdoor space you want to keep, how windows could face the house or yard, and any trees or slopes a site review should address.
Utilities and drainage
Trace a possible route and write down the unknowns.
Photograph visible utility equipment from a safe location. Note where water collects and which paving or landscape might be disturbed. Ask the site team to confirm connections and capacity.
Mark the paving and drainage the photo can’t show.

Property check
What should you look at first?
Tell us which space you’re considering, who will live there and how they will reach it. The checklist changes with your answers.
Your site-visit checklist
Check what the garage can contribute.
- Find any garage permit or previous plans. Photograph the slab, framing and areas where water collects.
- Walk the route from the gate to the bedroom and bathroom with the future resident. Note steps, thresholds and tight turns.
- Measure the tightest opening and photograph corners, steps and overhead obstacles.
- Locate the electrical panel and note where plumbing might connect.
Notes stay on this page until you download them. You can leave this blank.
This checklist prepares you for a site review. The reviewing agency and design team determine what can be built.
Walk the property in this order.
Street to gate
Photograph where someone arrives and where materials might be unloaded. Measure the tightest clear opening and flag corners, steps, low branches or wiring.
Gate to front door
Walk to the proposed door carrying something bulky. Mark where grading, thresholds or poor lighting could make the route difficult. Record where this route crosses the main household’s path.
The building area
Sketch the locations of existing structures and yard features you want to keep. Add the proposed footprint as a rough reference. Bring any survey or previous drawing set for the team to compare.
Utility and drainage points
Photograph the electrical panel and visible utility points. Mark areas where water collects or slopes toward the proposed building. Ask who will verify actual routes and service capacity.
Decide which yard space you want to keep before you walk the rest of the property.

What to bring to the first review
Organize a small set of records and photos. Identify assumptions clearly so the team knows what still needs verification.
| Bring | Why it helps | If it is missing |
|---|---|---|
| Property records | An address and parcel record help identify the reviewing agency. Existing approvals clarify what prior work is documented. | Write down any history you know and ask the team how to look up previous permits. |
| Photos and measurements | A photo sequence from the street to the yard shows access. A tape measure in the photo gives the team a useful reference. | Bring wide views and mark where an on-site measurement is still needed. |
| A household brief | List the people, daily routines, privacy needs and outdoor space the ADU must support. | Start with your three priorities and one feature you could trade away. |
| Your initial budget items | An initial list helps identify which items might be priced separately and where investigation is needed. | Use the Budget Studio worksheet to list what you have and leave unknowns blank. |

Photograph any paving, steps or drainage along the approach.
Site review checklistGet ready for the site walk.
Check off what you already have. Your downloaded checklist includes the items you still need to gather.
0 of 4 preparation items checked.
Return to download your checklist ↑Talk through your property with Direct ADU.
Bring the downloaded checklist and any property records you can find.